Trigon was the prime engineer for these improvements, providing engineering, design, bidding and construction phase services.
Highway 11 was the original highway into and out of southern Plaquemines Parish. It now continues to serve as an alternate route for Highway 23 and provides access to numerous residential neighborhoods, commercial properties and public/government facilities.
An old 12” cast iron water main on the south side of Highway 11, between Cozezu Drive and Auditorium Drive, historically served as the primary water feed for the area. This 12” main was in poor condition and has been subject to breaks/leaks over the years. Within the past decade a newer 12” PVC water main was installed on the north side of Highway 11 as a secondary feed.
This project generally included the installation of approximately 2,000 linear feet of new 8” PVC water main on the south side of Highway 11, adjacent to the old 12” cast iron main; the 12” main was abandoned after the new water main was put in service.
Following installation of the new and abandonment of the old water main, various pedestrian improvements funded by a federal grant were implemented such as new sidewalks. The improvements are intended to complement and serve several public facilities in the area such as a library, auditorium, school and fire station.
Trigon coordinated with the Parish and their private contractor that operates and maintains the water system in this area. Construction was completed by the Fall of 2012.
Project / Program Management • Planning • International Development
View Field Support Services Program for Global Affairs CanadaProject
Wastewater • Engineering & Design • Project / Program Management • Construction Management • Featured
View East Bank Wastewater Treatment Plant RAS Line and Pump Station ModificationsProject
Construction Management • Emergency Management • Planning • Engineering & Design
View Orange County Disaster Recovery Grants Program ManagementProject
Drainage • Emergency Management • Construction Management • Engineering & Design
View Permanent Protection for Drainage Outfall Canals and Pump StationsProject