Trigon performed all engineering and design for this $7.9M project that included two (2) 522,000-gallon diesel storage tanks; containment area; and delivery system comprised of one (1) 15,000-gallon day tank, piping, and valves. Also included the following ancillary equipment: two (2) fuel polishing units, one (1) oil-water separator, and a fire suppression system with AFFF bladder tank, potable water booster pump, and fire detection system. Trigon also performed environmental review and permitting services, as well as provided resident construction inspection and engineering services during construction. Project was completed in October 2019.
Water • Engineering & Design
View District B Miscellaneous Water ImprovementsProject
Wastewater • Planning • Engineering & Design • International Development
View Packaged Wastewater Treatment Plants Feasibility StudyProject
Wastewater • Engineering & Design
View Effluent Pump Station at the East Bank Wastewater Treatment PlantProject
Water • Engineering & Design • Emergency Management
View Watermain Replacement in Mandell Place, Montrose, Westmoreland, and Courtland Place SubdivisionsProject